LANGUAGE:
Dalian moving company
Contacts
TEL:0411-3958838
FAX: 1339000530
E-MAIL:service@flexeproductions.com
Knowledge

Moving process tips

    new house was a family event, who do not wish to rush, it is best to prepare. First arrange time. A move typically takes 2? 4 hours. If the distance, traffic, or transportation of goods, it may be longer. Secondly to reserve a vehicle with moving companies in advance, arrive on time and began to move. If more articles, a car pulled up, want to make an appointment more than cars, items away, you can save time. Encountered rain, snow, the best choice for a covered automobile, so as not to get wet. Once again to pack in advance. Larger boxes, prior out of the closet to avoid the movers can't lift shoes cartons on bits and pieces of the best, so as not to lose cash, jewelry and other valuable small items to carry sets, tea sets and other fragile items to be individually wrapped and separate handling so as not to break. Well prepared for in advance, your move will be very smooth.

      when moving some moving tips to avoid accidents when moving, which reduces the trouble in moving to yourself, as well as moving companies when moving to improve speed and efficiency. This effort, so why not?  

.  before the move:

      ten days before the move: If your new home decoration, make sure the completion date, recommended environmental protection ventilation for a week. In the meantime, you can inform the moving company assessment, determine the moving date. Prepare all kinds of packing materials as soon as possible. (Note: our company has a swing space. If you are an old house renovation, you can contact us, your unused items are properly safeguarded. )

seven days before the move: measure room size of new homes, measurement of large furniture, appliances, new home furniture layout (take care not to allow large furniture blocking Sockets). And all items classified, discarded items (Note: I run a thrift acquisitions). We recommend that you purchase new furniture and moving dates staggered.

five days before moving: clean furniture cabinets, spraying, avoid bringing cockroaches to new homes. New home thoroughly clean up, spraying insecticide and drain in the corner. Check the new toilet drain hole is smooth, ceilings and walls are leaking, if there are areas in need of repair. Remember to take their computer hard drive data backup, just in case. Demolition of complex audiovisual equipment lines, preferably in line and do a number on the Terminal.

three days before the move:

(1) connecting cable TV signal cable;

(2) pay telephone outages or transfer procedures;

(3) the property or to the last degree of electricity, gas and water company, suspended banking payment business;

(4) notification mail and milk companies change address;

(5) change of address notified relatives and friends;

(6) dismantle air conditioners and water heaters, washing and defrosting the refrigerator;

(7) documents, jewelry, books, securities central depository, if necessary to the Bank safes.  

second .  moving day:  

(1) before the movers arrive, now lives in the scrap on the floor, so as not to scratch the floor;

(2) before starting the handling, it is best to once again confirm the price is consistent with the previously agreed price;

(3) once again, telling workers what valuables and breakable items;

(4) when the goods reach the new flat, where is the best spot to tell workers placed large, save your tired of suffering;

(5) with the moving company before you checkout, be sure to first inventory items: focus on valuables, fragile items, loose items are lost or damaged, and household appliances are running well, bump or broken furniture, placing of bulky items to meet the requirements;

(6) records, contract, driver's name, car number, only to sign a contract;

(7) request an invoice or receipt after checkout.

three .  after the move:

moving after sorting:

(1) wipe the floors, tables, chairs, cabinets, etc;

(2) arrangement in place essential everyday items to ensure the normal order of life;

(3) organize commonly used goods, some usual basic things can be put into storage after finishing;

(4) when items are in place, after the room had been cleaned, make clothing, beds, table cloths, etc;

(5) Finally, the room that lets put some decorations to beautify your home.

damage claims:

(1) for damage to household appliances, moving company afford the maintenance costs should be invited, if damaged, new products should be compensated;

(2) damage for valuables, shall request the relevant compensation to the sector valuation;

(3) for the moving company caused personal injury, moving company should be responsible for medical expenses;

(4) if the claim dispute process, you can find consumer association or related Department to solve.

after settling:

(1) receive the necessary license: Community passport covers, vehicle passes, parking permits, dog cards, and so on;

(2) active and greet neighbors, mutual understanding, establishing initial relations with their neighbors.

Copyright 2006-2017 Dalian Moving Company, All rights reserved.